Acme Trendz Australia

Discover the seamless installation process that brings our natural stone creations to life on your spaces.

  • Installation Process of Exterior Applications

  • Step 1

    « Measure the surface you plan to cover. The surface to be treated should be thoroughly clean and dry. Mix the Adhesive Part A with the Adhesive »

  • Step 2

    « Part B in a ratio of 1 to 1 until a homogeneous mixture is obtained Apply the Adhesive mixture to the desired surface »

  • Step 3

    « Spread the Adhesive mixture with a notched trowel. Place the Sheet on the chosen surface Roll over the entire surface, making sure to apply pressure throughout the area. »

  • Step 4

    « Wait 24 hours until the adhesive dries completely. Sand the corners with sand paper. Protect the corners of the sheet with masking tape. »

  • Step 5

    « Apply the grout to the joints Remove the tape and apply the Sealant on the entire surface Let the Sealant dry for 24 hours. »

  • Download PDF

    «  Download installation pdf  »

Installation Process of Interior Applications
Step 1
Measure the surface you plan to cover. The surface to be treated should be thoroughly clean and dry. Using a caulking gun, apply the adhesive
Step 2
Apply adhesive around the perimeter leaving an offset of ¾” width leaving spaces of approximately 1¼” between each adhesive strip
Step 3
Spread the Adhesive mixture with a notched trowel. Place the Sheet on the chosen surface Roll over the entire surface, making sure to apply pressure throughout the area
Step 4
Wait 24 hours until the adhesive dries completely. Sand the corners with sand paper. Protect the corners of the sheet with masking tape
Step 5
Apply the grout to the joints Remove the tape and apply the Sealant on the entire surface Let the Sealant dry for 24 hours